About The Project

On this project EH Group® were commissioned to remove a service road and provide additional burial space.
“The road was demolished by a 25 tonne EH Group® excavator and all concrete and rubble removed from site. The concrete from the road was crushed, screened and re used in numerous EH Group® projects reducing the carbon footprint.”
EH Group® undertook the logistical task of removing hundreds of tons of concrete through an operational and busy site. This was achieved by undertaking the task out of hours.
The mapping carried out by EH Group® enabled the final design to maximise the number of burial spaces to create the maximum revenue from the land space. A DDA path was incorporated within the plans to address a pedestrian walkway and create pathside graves. screened top soil was imported to replace the reduced levels left by the concrete this was leveled and seeded with grass seed.