EH Group® was called in to look at a site in Beckenham where the existing memorial gardens had been built on unstable ground and subsequently they had started to subside and sink.
After surveying the site EH Group® devised a plan to install a new foundation suitable for the ground conditions which involved completely rebuilding the memorial gardens. The project threw up a number of technical challenges as the building work was in the middle of a memorial area in close proximity to ash interments that could not be disturbed.
From initial inspection the project took nine weeks to complete and was handed back on time and within budget with EH Group® having restored the memorial gardens back to their former glory.